STUDIOANT






















Phase 2 included several outdoor pools and a pool building (locker rooms & snack bar) that I designed to be naturally ventilated and sustainable.
Rock Springs Aquatic Addition
Role:
Job Captain,
Conceptual Design through Construction Administration
Firm: OLC Architecture
Project Location: Rock Springs, WY
Project Size: 12,000 sq. ft.
Project Cost: $7 million
Project Completed: 2010
Client: City of Rock Springs
Parks & Recreation Department
Description:
Phase 1: A community splash pad with a large water geyser that overflows into a shallow river lined with several spray features. Also part of phase 1 is the indoor aquatic expansion with leisure pool, dual water slides with a splash zone, large current channel, and play structure, as well as the addition of party rooms and family changing area. A unique sunken patio will complete the aquatic addition by connecting to the phase two outdoor pool addition.
Phase 2: Adjacent to the expansion will be an outdoor pool and pool house which features a leisure pool with another zero-depth entry and a play structure, spray arches and geysers, and a 4-lane, 25-yard lap pool, new pool house locker rooms, concessions and several picnic pavilions.